Muscat Grand Tower
Muscat, Oman · Commercial · 2024
Twelve high-speed passenger elevators and two panoramic units for a landmark commercial tower on the Corniche.
Challenge
High traffic peaks and tight construction windows required destination control and phased handover.
Solution
Deployed gearless high-speed elevators with destination dispatch, regenerative drives, and IoT monitoring.
Results
- 40% traffic wait reduction
- Phased handover on schedule
- Zero installation safety incidents
Products used
- Passenger Elevators
- Panoramic Elevators
Ready to elevate your next project?
Speak with our engineers for specifications, traffic studies, and a tailored proposal— or reach our emergency desk anytime.
